PDF Print E-mail

Partnership

Phase One Completed; Westminster Construction Phase 2 Announced

Campus

Phase One of the Westminster College and Seminary master plan is complete and operating. The College and Seminary are very grateful for the Lord’s provision. Our ten-acre site now has seven beautiful buildings with over 13,000 square feet providing the necessary walls and roofs for the forty-six College students and the forty-five Seminary students who have enrolled in courses during the first half of 2009. We hear daily from visitors, students and faculty, expressing gratitude for the quality of the buildings, the beauty of the setting (overlooking Lake Victoria) and the ideal study environment.

Phase 2 will include one dormitory, a public toilet, dining hall and “outdoor” African-style kitchen, landscaping and additional site work. The total square footage for Phase 2 is 7,267 and the construction cost estimate is $193,335. As in Phase 1, we look to God’s faithful provision and His timing for this next important step of new construction.

Phase 1

  • Seven buildings (three dormitories, temporary library, three classrooms, administration building, faculty offices, staff quarters, temporary dining hall and kitchen)
  • Square feet: 13,077
  • Student capacity: 60 (three dormitories)
  • Cost of buildings: $326,980 ($25.00 per square foot)
  • Total Phase 1 cost: $453,456
  • Donors: 11 churches, 20 individuals

Phase 2

  • Four buildings (one dorm public toilet, dining hall, dining hall verandas, “outdoor” African-style kitchen, walkway from dining hall to outdoor kitchen; site work, landscaping)
  • Square feet: 7,267
  • Student capacity: 80 (four dorms)
  • Estimated construction cost of the buildings: $176,335 ($24.26 per square foot)
  • Total Phase 2 estimated cost: $193,335
  • Funds on hand: $9,257 (in bricks)

Will you prayerfully consider partnering with Westminster Theological College and Seminary and the Presbyterian Church in Uganda to develop our new campus that can serve to prepare leaders for the church in Africa for generations to come?

If you are interested in partnering with Westminster in Phase 2 of the new campus construction, please direct any inquiries to Reverend Emma Kiwanuka, Dean of the College and Principal of the College and Seminary This e-mail address is being protected from spambots. You need JavaScript enabled to view it or to Dr. Dave Eby, lecturer at the College and Dean of the Seminary This e-mail address is being protected from spambots. You need JavaScript enabled to view it .